Westlake Publishing Forums
June 15, 2019, 09:10:26 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News:     REGARDING MEMBERSHIP ON THIS FORUM: Due to spam, our server has disabled the forum software to gain membership. The only way to become a new member is for you to send me a private e-mail with your preferred screen name (we prefer you use your real name, or some variant there-of), and email adress you would like to have associated with the account.  -- Send the information to:  Russ at finescalerr@msn.com
 
   Home   Help Search Login  
Pages: 1 2 [3] 4 5 6 ... 18
  Print  
Author Topic: My coal mine scale 1:22.5  (Read 90193 times)
Malachi Constant
Hero Member
*****
Offline Offline

Posts: 1544



« Reply #30 on: June 20, 2011, 01:44:34 AM »

Helmut --

That's a wonderful little wheelbarrow, full of character.  Lots of fun watching you develop a scene that you know so well.

Cheers,
Dallas
Logged

-- Dallas Mallerich  (Just a freakin' newbie who stumbled into the place)
Email me on the "Contact Us" page at www.BoulderValleyModels.com
Frederic Testard
Hero Member
*****
Offline Offline

Posts: 634



« Reply #31 on: June 20, 2011, 03:22:57 AM »

The detailing and finish of this wheelbarrow are very nice, Helmut.
Logged

Frederic Testard
Design-HSB
Hero Member
*****
Offline Offline

Posts: 673


Klosterstollen


WWW
« Reply #32 on: June 26, 2011, 12:36:09 PM »

Meanwhile, the wheelbarrow has also received islets and the last piece of wall was also designed in different colors.

Logged

Regards Helmut
the journey is the goal
Design-HSB
Hero Member
*****
Offline Offline

Posts: 673


Klosterstollen


WWW
« Reply #33 on: July 20, 2011, 01:18:00 AM »

It goes on in my coal mine.

Once it was the diorama to decompose further.


Cover plate removed for better access

Where I was at it, I've also done the same time a picture from below.


Diorama from below.

The reason for this workthe pivot platform is that I want to integrate as the original.


The swivel base model

Now I could roll the car on my first pivot platform.


Very first test of the swivel base.


View of the swivel base down in the diorama.

After the first successful test, I can now build on the pivot soothes platform.
Logged

Regards Helmut
the journey is the goal
finescalerr
Administrator
Hero Member
*****
Offline Offline

Posts: 5368


« Reply #34 on: July 20, 2011, 01:33:50 AM »

Not bad. -- Russ
Logged
Design-HSB
Hero Member
*****
Offline Offline

Posts: 673


Klosterstollen


WWW
« Reply #35 on: July 21, 2011, 07:10:15 AM »

But it goes further and the last days I've spent so that the latch on of the pivot platform design, here are the first pictures.

Lock for pivot platform (locked)

Lock for pivot platform (unlocked)
Of course it works, and to my surprise, even better than the original.
Only it is of course quite finished yet, but that in between to watch, maybe even interesting.
Logged

Regards Helmut
the journey is the goal
Ray Dunakin
Hero Member
*****
Offline Offline

Posts: 3949



WWW
« Reply #36 on: July 21, 2011, 02:42:56 PM »

Pretty cool. I like the concept of the pivot platform -- kind of a small turntable for tight spaces.
Logged

Visit my website to see pics of the rugged and rocky In-ko-pah Railroad!

Ray Dunakinís World
Design-HSB
Hero Member
*****
Offline Offline

Posts: 673


Klosterstollen


WWW
« Reply #37 on: August 08, 2011, 03:54:23 PM »

Hi Ray,

thank you very much, here is the continuation of modeling.

Since I do want to build this army field in the model railroad track, I have worried only once a pattern of an original.

Army Field Railway Track

First I have the clamps built on the model to scale.

Clamping plates for army field railroad track.

Then after I built a pattern, a threshold model.

Army field model railroad track emerging patterns already primed with a rust color.

The sleepers are cut from polystyrene waste.
For the holes I have just as for the track made a jig.


I start the Army field model railway construction.
Logged

Regards Helmut
the journey is the goal
finescalerr
Administrator
Hero Member
*****
Offline Offline

Posts: 5368


« Reply #38 on: August 09, 2011, 02:18:31 AM »

You have lost your mind.

In a good way.

Russ
Logged
nk
Full Member
***
Offline Offline

Posts: 227



WWW
« Reply #39 on: August 09, 2011, 07:21:25 AM »

nice work on the track details.
Logged

You may ask yourself: "Well, how did I get here?"

http://public.fotki.com/nkhandekar/
marc_reusser
Curmudgeon
Administrator
Hero Member
*****
Offline Offline

Posts: 4504



WWW
« Reply #40 on: August 16, 2011, 03:40:18 AM »

BOAH!...super!

M
Logged

I am an unreliable witness to my own existence.

In the corners of my mind there is a circus....

M-Works
Design-HSB
Hero Member
*****
Offline Offline

Posts: 673


Klosterstollen


WWW
« Reply #41 on: August 25, 2011, 08:10:09 AM »

Meanwhile, I've been tinkering and would like to present the results here.


Siding with the locked and Heeresfeldbahn thresholds.


Siding finished with gravel.

Even on my boots so I Wascher busy with roof sleepers.


Etched as part of the roof threshold


Connection via terminal plate with screws and nuts M 0.6, of course electrically isolated.


Roof sleeper track from below.


Roof sleeper track with coin for size comparison.

The track is designed for the tunnel established by mine cars.

Of course, moving models offer even more and why I have built more quickly a spinner.


Turntable stage with electrically isolated rails.


Circular track with a hub and sliding contacts for power transmission.


Turntable fitted with servo drive.

So now is build it further, because on Sunday the 4th September, I want to show my model in the monastery gallery.
Logged

Regards Helmut
the journey is the goal
Ray Dunakin
Hero Member
*****
Offline Offline

Posts: 3949



WWW
« Reply #42 on: August 25, 2011, 12:12:09 PM »

Wow, that track is put together just like the real thing!
Logged

Visit my website to see pics of the rugged and rocky In-ko-pah Railroad!

Ray Dunakinís World
finescalerr
Administrator
Hero Member
*****
Offline Offline

Posts: 5368


« Reply #43 on: August 25, 2011, 02:08:43 PM »

Most satisfactory. Should you ever want to publish the diorama, I might know somebody who could help .... -- Russ
Logged
Design-HSB
Hero Member
*****
Offline Offline

Posts: 673


Klosterstollen


WWW
« Reply #44 on: August 26, 2011, 05:35:26 AM »

This will be the completion take some time but until then I can still write the occasional report.

Just as there are only supplement once again a picture of a model of the turntable.
Ray, yes, such a construction is modeled after a challenge.


Monastery tunnel turntable with catch hills beyond.


Servo-drive turntable view from below.

In collecting the hill then inserted and the drive of the turntable.

Russ, I think when I'm on is perhaps a more beautiful you are reporting.
It still lacks a lot of detailed work especially aging and weathering.
Logged

Regards Helmut
the journey is the goal
Pages: 1 2 [3] 4 5 6 ... 18
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.13 | SMF © 2006-2011, Simple Machines LLC Valid XHTML 1.0! Valid CSS!